Pre CoalescerInlet

Figure 31. Example of a pre-coalescer.

PECT-F Configuration

Figure 31. Example of a pre-coalescer.

Figure 30. Cut size curve for a deoiling hydroclone.

Drcp Size (micrcns)

Drcp Size (micrcns)

One common construction is achieved by wrapping a secondary steel wall completely around the primary vessel. Each double wall vessel is constructed using the same basic fabrication techniques as used on single wall vessels, the area between the vessel walls, known as the interstice, can be monitored by a leak detection system installed in the monitor tube, located on the vessel head. Other variations of vessel construction exist and careful consideration to the advantages, disadvantages and impacts on cost must be considered. Remember to select a separator based in part on vessel construction quality meeting API, UL (Underwriter Laboratories), and Steel Tank Institute (STI) ACT-100 or STI-P3 specifications. It goes without saying that the supplier must conform to ISO 9000 quality assurance standards.

Waste Management And Control

Waste Management And Control

Get All The Support And Guidance You Need To Be A Success At Understanding Waste Management. This Book Is One Of The Most Valuable Resources In The World When It Comes To The Truth about Environment, Waste and Landfills.

Get My Free Ebook


Post a comment